Slides from a talk by John Dales at monthly meeting on 15th June 2015
Treasurer’s Report 2014-15
By Meade McCloughan
Tavistock Place upgrade
The Tavistock Place cycle track is a popular route and a victim of it own success. A campaign to upgrade it was launched in summer 2013 with a video illustrating the current problems on this route. The West End Project report (January 2015) proposed a trial in which: the existing two-way segregated cycle track to operate as… [Read More]
Swiss Cottage Gyratory CCCʼs Choice between five Options for further development
Swiss Cottage five options
Cyclist safety in Vernon Place
For meeting between CCC and Camden Council;
25 February 2015
Junction Royal College Street – St Pancras way
Outlines three approaches considered for the design of this junction
Royal College Street – northern extension
The northern extension runs from the junction with Kentish Town Road to the junction with Baynes Street south of Camden Road
Pancras Road Junctions
The Royal College Street Southern extension will link to two new routes via the junction at Midland Road. – a N-S route down Midland Road and on to Judd Street which is now possible southbound; the next stage will be a northbound contraflow across Euston Road – an E-W route along Goodsway Camden consulted on… [Read More]
Royal College Street – southern extension
Construction summer 2015 The scheme was built in Summer 2015 with stepped tracks on both sides of the road. It was very well received. See our report of an informal inspection. Consultation Camden consulted on a southern extension from Crowndale Road to Midland Road in October – November 2014. See our discussions on CycleScape. RCS southern extension response Meeting… [Read More]
CCC -Issues for LIP 2011-14
Suggestions for permeability and safety concerns.