Tavistock Place upgrade

The Tavistock Place cycle track is a popular route and a victim of it own success. A campaign to upgrade it was launched in summer 2013 with a video illustrating the current problems on this route. The West End Project report (January 2015) proposed a trial in which: the existing two-way segregated cycle track to operate as […]

The Tavistock Place cycle track is a popular route and a victim of it own success. A campaign to upgrade it was launched in summer 2013 with a video illustrating the current problems on this route.

The West End Project report (January 2015) proposed a trial in which:

  • the existing two-way segregated cycle track to operate as a one-way eastbound cycle lane
  • one eastbound traffic lane would be maintained
  • the existing westbound traffic lane would be converted to a lane for cycling and servicing vehicles only

March 2015, we were shown the simple designs required to inform users of each junction as to the new permitted movements.

This 12-month trial will commence in June 2015.

 

 

Scroll to Top