Tavistock – Torrington trial will double S4C
1st July 2015: Cllr Jones has signed off the proposed trial in which the entire westbound carriageway between Gower Street and Judd Street will be reallocated from motors to cycles
1st July 2015: Cllr Jones has signed off the proposed trial in which the entire westbound carriageway between Gower Street and Judd Street will be reallocated from motors to cycles
Dates: consultation 22nd June 2015; reply due 3rd August 2015.
Officers: Tabrez Hussain. CC member dealing with it Jean Dollimore. Responded 31st July 2015.
On Saturday 13th June 2015, Steven Edwards led our seventh inspection ride – around Gospel Oak.
CCC-Camden quarterly mtg 15-06-15.minutes
Report on talk at our meeting on 16th June by John Dales. Where space is tight, to get better conditions for safe cycling, reduce the number & speed of motor vehicles…
Slides from a talk by John Dales at monthly meeting on 15th June 2015
Reports by Angela Hobsbaum Coordinator and Meade McCloughan Treasurer. Committee re-elected plus Ursule Thurnherr
Do you own a bike? Would you like to cycle to work? Why not try it, while Tufnell Park Station is closed?
Beat the crowds. Beat the congestion. Get fitter.
The Tavistock Place cycle track is a popular route and a victim of it own success. A campaign to upgrade it was launched in summer 2013 with a video illustrating the current problems on this route. The West End Project report (January 2015) proposed a trial in which: the existing two-way segregated cycle track to operate as
Swiss Cottage five options