See discussion on CycleScape
http://www.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation
Response for CCC to N-S consultation
The Camden Branch of the London Cycling Campaign
Dates: consultation 3 September 2014; reply due 9 November 2014. CCC member responsible George Coulouris
Added on 03/09/2014 by Jean Dollimore
See discussion on CycleScape
http://www.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation
Response for CCC to N-S consultation
Filed under: Consultations