Traffic Studies Related to Cycle Gate Junctions
Jean Dollimore, George Coulouris, John Chamberlain
Camden Cycling Campaign
12th August 2015
The Camden Branch of the London Cycling Campaign
This report presents data collected to study the time required for cyclists to travel across a signalised junction. The time was measured from video surveys undertaken at three relevant junctions. All three junctions have a cycle box; one also has a separate cycle ‘early release’ signal. Times were measured for the first and last cyclist in the box to cross the junction and for the first motor to enter the junction.
Added on 21/08/2015 by Jean Dollimore
Traffic Studies Related to Cycle Gate Junctions
Jean Dollimore, George Coulouris, John Chamberlain
Camden Cycling Campaign
12th August 2015