On Sunday 20th May, John led a group of 11 cyclists on an 18 mile ride to the Lee Valley and back
Great Ormond Street area
proposed pedestrian and cycling improvements
Dates: consultation 18 May 2012; reply due 15 June 2012.
Officer: Joanna Alker, CCC member dealing with it John Chamberlain
Howland Street traffic signals
Signals have been removed in Howland Street and Maple Street at the junction with Charlotte Street and Fitzroy Street; does this affect safety of cyclists in the segregated cycle tracks? Report on a site inspection on 27th March 2012.
CCC Coordinators’ Report 2011-12
Stefano Casalotti and Jean Dollimore
Dukes Road
Proposed Cycle Permeability Improvements
Dates: consultation 11 May 2012; reply due 8 June 2012.
Officer: Joanna Alker, CCC member dealing with it Jean Dollimore. Replied 6 June 2012.
Bloomsbury 20mph Area
Proposed 20mph speed limit & improvements
Dates: consultation 11 May 2012; reply due 8 June 2012.
Officer: Joanna Alker, Simi Shah. CCC member dealing with it Jean Dollimore. Replied 6 June 2012. Approved 25 Sept 2012
The Big Ride 28 April 2012
The ride was organised so as to show mayoral and GLA candidates that London Cyclists want to go Dutch.
Ride on Thames Towpath
Led by James Brander, 15 April 2012
Two way cycling in Kings Cross area
Camden has now (April 2012) implemented two-way cycling in all of the streets in the area between Euston Road, Grays Inn Road, Regents Square and Argyle Street
Hyder Modelling of CCC Designs for Euston Circus
They model three variants of our proposal 1) as proposed 2) with bus contraflow on wrong side 3) on right side. All rejected by Hyder but 3 is the best
![](https://camdencyclists.org.uk/wp-content/themes/dynamik-gen/images/content-filler.png)