Treasurer’s Report 2014-15
By Meade McCloughan
All reports and talks, mostly written by CC
The Tavistock Place cycle track is a popular route and a victim of it own success. A campaign to upgrade it was launched in summer 2013 with a video illustrating the current problems on this route. The West End Project report (January 2015) proposed a trial in which: the existing two-way segregated cycle track to operate as
Swiss Cottage five options
For meeting between CCC and Camden Council;
25 February 2015
Outlines three approaches considered for the design of this junction
The northern extension runs from the junction with Kentish Town Road to the junction with Baynes Street south of Camden Road
The Royal College Street Southern extension will link to two new routes via the junction at Midland Road. – a N-S route down Midland Road and on to Judd Street which is now possible southbound; the next stage will be a northbound contraflow across Euston Road – an E-W route along Goodsway Camden consulted on
Construction summer 2015 The scheme was built in Summer 2015 with stepped tracks on both sides of the road. It was very well received. See our report of an informal inspection. Consultation Camden consulted on a southern extension from Crowndale Road to Midland Road in October – November 2014. See our discussions on CycleScape. RCS southern extension response Meeting