Dates: consultation 28th May 2019; 28th June 2019; consultations@tfl.gov.uk Managed by JC. Responded 29 June 2019
Will Norman’s talk at CCC AGM 20 May 2019
Will Norman, London’s Walking and Cycling Commissioner told us how TfL will implement the Mayor’s transport strategy for Healthy Streets.
Midland – Judd link opened in May
This new link joins the Royal College St, Pancras Rd route to CS6 which runs from Judd St to Elephant & Castle; and meets CS3 at Blackfriars bridge
Audit of Midland Road – Judd Street May 2019
We walked and cycled the route in both directions between the junction with Pancras Road and the top of Judd Street. We feet that the implementation of the scheme is of a very high standard: The surface of the cycle tracks is beautifully smooth; The stepped tracks provide appropriate segregation for this road (although we have some concerns where it is adjacent to the taxi rank, explained below) and their width allows overtaking; The junction at Euston Road functions very well, allowing people to make all the available turns without interaction with motor vehicles.
The junction with Pancras Road functions very well for people on the N-S alignment, but as we have noted before, it has a single critical failure out of the six possible movements, i.e. the commonly-used right-turn movement out of the the rail overbridge, the other five movements being fully protected from interaction with motor vehicles.
Camden Cyclists E-news May 2019
A LN for Holborn; social ride with islington
Two new permeability gains in Hatton Garden area
Early in May, two-way cycling was introduced into St Cross Street and Saffron Street close to the route of CS6.
Prince of Wales Road Cycling and Walking Improvement Scheme TMO Consultation
Dates: consultation 18th April 2019; 10th May 2019; TransportConsultations@camden.gov.uk Managed by JD. RESPONDED 9 May 2019
Euston Road / Churchway / Duke’s Road safety improvement scheme
Dates: consultation 15th April 2019;17 May 2019 ; Lorraine Hinds and yoursay@tfl.gov.uk Managed by JD.
Greening of Phoenix Road
Dates: consultation 1 April ; closes 31 May; greeningphoenixroad@camden.gov.uk; managed by JC
CCC meeting minutes 15 April 2019
Bike Week Events; meetings (Phoenix Road greening, Kings Blvd, B groups)l; Expanding our infrastructure team; financial statement; Review of LCC’s Infrastructure Handbook