HS2 Petition Nos. 861 and AP3:92
For meeting of the Select Committee on HS2; Presented by Angela Hobsbaum; Coordinator Camden Cycling Campaign
All reports and talks, mostly written by CC
For meeting of the Select Committee on HS2; Presented by Angela Hobsbaum; Coordinator Camden Cycling Campaign
Map of the route provided by Sustrans August 2014 John Chamberlain took part in a route inspection ride organised by Sustrans together with members of LCC in Waltham Forest, Hackney and Islington. The route in Camden is on a Grid link (Guilford Street-Calthorpe Street). The design will be carried out by Camden who have already
Regents Park to Gladstone Park Quietway (QW) Early in summer 2014 we had heard that some QWs had been prioritised for completion by 2016 including this one (previously named Jubilee QW) which was was not one of our chosen top five! We were invited to a meeting by Jimmy Hall of Sustrans at the end of July.
This report presents data collected to study the time required for cyclists to travel across a signalised junction. The time was measured from video surveys undertaken at three relevant junctions. All three junctions have a cycle box; one also has a separate cycle ‘early release’ signal. Times were measured for the first and last cyclist in the box to cross the junction and for the first motor to enter the junction.
Slides from a talk by John Dales at monthly meeting on 15th June 2015
The Tavistock Place cycle track is a popular route and a victim of it own success. A campaign to upgrade it was launched in summer 2013 with a video illustrating the current problems on this route. The West End Project report (January 2015) proposed a trial in which: the existing two-way segregated cycle track to operate as
Swiss Cottage five options
For meeting between CCC and Camden Council;
25 February 2015