Minutes of CC meeting, 26 September 2016
Hampstead Heath Cyclists Working Group. Tavistock Place Campaign. CS11 – against the opposition. Pratt Street demonstration.
Hampstead Heath Cyclists Working Group. Tavistock Place Campaign. CS11 – against the opposition. Pratt Street demonstration.
Cycle counters show a substantial increase in numbers since opening of RCS northern extension
These points summarise our position and we are happy to be quoted on them.
Background to the consultation For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as
Train assisted, family-friendly ride starting in Richmond and going through Syon, Osterley and Gunnersbury Parks and two sections of the Grand Union Canal.
There is no excerpt because this is a protected post.
Report on LCC issues, Cycle to Work Day, Committee Roles and Responsibilities, Replacement Coordinator, Tavistock Place Campaign
Surveys taken: Monday 1 August This survey gives snapshots of travel times in traffic conditions at two different times as given by Google’s crowdsourcing techniques*. Drop offs at disabled-friendly rear entrance to UCLH. Gower Street drop offs are about 3 mins quicker. A starting point anywhere on Judd/Hunter would give similar results. 1. Old route via
On Sunday 21st August, Geoff led a circular ride from Sidings to the Welsh Harp with a refreshment stop at the Birchen Grove Garden Centre café .
This post shows how to reduce rat running in Judd Street and Hunter Street and hence reduce the domination by motor vehicle traffic.