CC author, Reports

QW3 – originally Jubilee Quietway

Regents Park to Gladstone Park Quietway (QW) Early in summer 2014 we had heard that some QWs had been prioritised for completion by 2016 including this one (previously named Jubilee QW) which was was not one of our chosen top five! We were invited to a meeting by Jimmy Hall of Sustrans at the end of July.

Newsletters

Camden Cyclists News, September 2015

Camden Cyclists e-Newsletter  September 2015 Dates for your diary: Sunday 6 September 10.30am-3.30pm Camden Cyclists’ Lea Valley Ride This is a family oriented ride to the Lea Valley, along the towpath and back via Finsbury Park. Lunch at a cafe by the river or bring your own. Easy paced with time to look around and

CC author, Reports

Traffic Studies Related to Cycle Gate Junctions – DRAFT

This report presents data collected to study the time required for cyclists to travel across a signalised junction. The time was measured from video surveys undertaken at three relevant junctions. All three junctions have a cycle box; one also has a separate cycle ‘early release’ signal. Times were measured for the first and last cyclist in the box to cross the junction and for the first motor to enter the junction.

Scroll to Top