Consultation on Delancey–Pratt , August 2015
Dates: consultation 23rd August 2015; replied 28th September 2015. Signed off Dec 2015.
Officer: John Futcher. CC member dealing with it John Chamberlain.
Dates: consultation 23rd August 2015; replied 28th September 2015. Signed off Dec 2015.
Officer: John Futcher. CC member dealing with it John Chamberlain.
This report presents data collected to study the time required for cyclists to travel across a signalised junction. The time was measured from video surveys undertaken at three relevant junctions. All three junctions have a cycle box; one also has a separate cycle ‘early release’ signal. Times were measured for the first and last cyclist in the box to cross the junction and for the first motor to enter the junction.
Report on a circular ride from Flitwick Station with lunch at Shuttleworth collection and tea at St Mary’s Haynes,
Dates: consultation 13th August 2015; reply due 27th September 2015; consultations@tfl.gov.uk: CC member dealing with it Angela Hobsbaum. Response 25th September 2015.
Regent’s Park / Cycle Superhighway 11, Pedestrian/Cycle Bridge, Camley Street – King’s Cross Central, Widening existing painted cycle lanes. 2015-07-20_CCCmeeting
Camden Cyclists e-Newsletter August 2015 Dates for your diary: Saturday 1 August 10.15 am – 4 pm London FreeCycle Swiss Cottage Gardens, Winchester Road, NW3 3EX Our feeder ride to this massive celebration of cycling leaves Swiss Cottage at 10.30 and will join the main ride at Trafalgar Square. It will be well marshalled and
Dates: consultation 2nd July 2015; reply due end July (?).
CC member dealing with it George Coulouris. Responded to cyclegrid@westminster.gov.uk 26th July 2015.
Gospel Oak Inspection Ride, quarterly meeting, S4C campaign, Tufnell Park Cycle to Work, Dartmouth Park traffic monitoring, Construction Management Plans; talk by John Dales
On 11th July 2015, Geoff Stilwell led a fun ride sampling from Ice Cream parlours in Camden.
Summary of first year’s data. On Thu 9 July a record 2627 people used the Royal College Street cycle tracks to avoid the tube strike.